As of this week, traffic on the A184 Newcastle Road can fill both lanes as it is returned to a dual carriageway, while construction is continuing by the side of the road as part of the plans.
As of this week, traffic on the A184 Newcastle Road can fill both lanes as it is returned to a dual carriageway, while construction is continuing by the side of the road as part of the plans.